                     HOUSE FINANCE COMMITTEE                                   
                        February 12, 1993                                      
                            1:40 p.m.                                          
                                                                               
  TAPE HFC 93-21, Side 1, #000 - end.                                          
  TAPE HFC 93-21, Side 2, #000 - end.                                          
  TAPE HFC 93-22, Side 1, #000 - #347                                          
                                                                               
  CALL TO ORDER                                                                
                                                                               
  Co-Chair MacLean called the House Finance Committee to order                 
  at 1:40 p.m.                                                                 
                                                                               
  PRESENT                                                                      
                                                                               
  Co-Chair MacLean                                                             
  Representative Martin                                                        
  Representative Navarre                                                       
  Representative Brown                                                         
  Representative Parnell                                                       
                                                                               
  Representatives   Hoffman,   Grussendorf,   Hanley,  Foster,                 
  Therriault and Co-Chair Larson were absent from the meeting.                 
                                                                               
  ALSO PRESENT                                                                 
                                                                               
  Representative  Toohey;  Mike Greany,  Director, Legislative                 
  Finance Division; Nancy Bear-Usera, Commissioner, Department                 
  of  Administration; Sharon  Barton, Director,  Department of                 
  Administration;   John    Abshire,   Deputy    Commissioner,                 
  Department  of  Labor;  David  Teal,  Director,  Division of                 
  Administrative Services, Department  of Labor; Janet Clarke,                 
  Director, Division os Administrative Services, Department of                 
  Health and Social Services; Newton Chase, Facilities Section                 
  Chief,  Division of  Administrative Services,  Department of                 
  Health  and Social Services; Major  General Hugh L. Cox III,                 
  Adjutant General,  Commissioner, Department of  Military and                 
  Veterans Affairs;                                                            
  Jeff   Morrison,   Director,   Administrative  and   Support                 
  Services, Department of Military and Veterans Affairs.                       
                                                                               
  SUMMARY INFORMATION                                                          
                                                                               
  HB 60     "An   Act   making   appropriations  for   capital                 
            projects; and providing for an effective date."                    
                                                                               
       OVERVIEWS:     Department of Health and Social Services                 
                      Department of Administration                             
                      Department of Labor                                      
                      Department  of  Military   and  Veterans                 
                                                                               
                                1                                              
                                                                               
                                                                               
                      Affairs                                                  
                                                                               
  Members  were provided  with  detailed  descriptions of  the                 
  Department's Capital Improvement  Projects (CIP) request  as                 
  described in the Office of  Budget and Management's detailed                 
  budget books (copy on file).                                                 
                                                                               
  DEPARTMENT OF HEALTH AND SOCIAL SERVICES                                     
                                                                               
  JANET CLARKE, DIRECTOR, DIVISION OF ADMINISTRATIVE SERVICES,                 
  DEPARTMENT  OF  HEALTH AND  SOCIAL  SERVICES noted  that the                 
  Department employs over  2,000 employees and covers  a large                 
  range of projects and programs.  The Department has 25 state                 
  owned facilities and is in 88 sites across the State.                        
                                                                               
  Ms. Clarke noted  that the Department's CIP  budget revolves                 
  around:                                                                      
                                                                               
       *    Transforming the mental health system;                             
       *    Improving operating efficiency; and                                
       *    the  Harbor  Developmental  Center  -  steam  heat                 
            system.                                                            
                                                                               
  Ms. Clarke discussed  prioritization of deferred maintenance                 
  projects.  She noted that projects are reviewed at the start                 
  of  every  fiscal  year.    She  provided  members with  the                 
  Department of  Health and  Social Services's  FY 94  Capital                 
  Budget priority  list (Attachment  1).   She also  presented                 
  members with information entitled, "API (Alaska  Psychiatric                 
  Institute) 2000, Mental Health Alaska," (Attachment 2).                      
                                                                               
  Ms. Clarke noted that the Department's first CIP priority is                 
  $1.557.3 million dollars  for Renovation/Repair/Replacement,                 
  Equipment and Deferred  Maintenance.  She noted  that clinic                 
  repairs, roof  replacement, asbestos  abatement and  kitchen                 
  equipment  replacement  will  be  provided  for  under  this                 
  request.                                                                     
                                                                               
  Ms. Clarke commented  on the Department's $1  million dollar                 
  request for Americans with  Disabilities Act (ADA) Response.                 
  She noted  that the Department of Health and Social Services                 
  would not  be seeking  funding for  ADA projects  within the                 
  Department of Transportation and Public Facilities's budget.                 
                                                                               
  Representative Navarre asked if the deferred maintenance was                 
  actual or anticipated.  Ms. Clarke replied that the deferred                 
  maintenance is actual.                                                       
                                                                               
  Ms. Clarke discussed the Department's $300.0 thousand dollar                 
  request  for completion  of  the  McLauglin  Youth  Center's                 
  electrical fire control system.   She noted that the project                 
  was  begun  in  FY   93  under  a  $250.0   thousand  dollar                 
                                                                               
                                2                                              
                                                                               
                                                                               
  appropriation.                                                               
                                                                               
  Ms.  Clarke  referred  to the  Department's  CIP  request of                 
  $100.0  thousand  dollars   for  Ketchikan  Secure   Modular                 
  Completion.  Representative  Navarre asked for an  update of                 
  expenditures.                                                                
                                                                               
  NEWTON  CHASE,   FACILITIES  SECTION   CHIEF,  DIVISION   OF                 
  ADMINISTRATIVE  SERVICES, DEPARTMENT  OF  HEALTH AND  SOCIAL                 
  SERVICES  clarified  that  the first  appropriation  to  the                 
  Ketchikan Youth Facility  was in FY  84.  The original  plan                 
  was for a  12 bed facility.   Current funding will  complete                 
  two holding cells  for juvenile  offenders.  The  department                 
  has spent $100.0 thousand dollars on site in connection with                 
  the  Ketchikan  Health  Center.   The  Department  has $90.0                 
  thousand dollars  to put  the project  to bid.   The  $100.0                 
  thousand dollar request will ensure completion of the award.                 
                                                                               
  Ms.  Clarke clarified  that  the  Department's projects  are                 
  prioritized as listed.                                                       
                                                                               
  Ms. Clarke discussed the Department's  CIP request of $250.0                 
  thousand dollars for the Disabled Vocational Training Center                 
  roof  replacement.   She noted  that the  building has  been                 
  returned to the State.                                                       
                                                                               
  Ms. Clarke noted  that the  Department's second priority  is                 
  $4,476.6 million dollars  for Computers/Communication.   She                 
  relayed that the Department is operating from the Department                 
  of  Health and Social  Services Management Information Plan.                 
  She assured members that the Department intends to integrate                 
  its data systems.                                                            
                                                                               
  Representative  Martin  asked if  the  Department's requests                 
  have received approval from the Information Systems Projects                 
  Review  Committee   in  the  Department   of  Administration                 
  (ISPRC).   Ms. Clarke  clarified that  many of the  projects                 
  received approval  in their phase  one form.   The Committee                 
  has not met to approve FY 94 projects.                                       
                                                                               
  Representative  Navarre  asked for  statistics  of state  v.                 
  federal caseloads.   He noted  that regional field  offices'                 
  computer and data systems  are not being updated  as quickly                 
  as the central offices.  Ms. Clarke recognized the problem.                  
                                                                               
  Ms.  Clarke  discussed  the  Department's  CIP  requests  of                 
  $2,988.2 million dollars for EIS Redesign (This project is a                 
  component of the Department's second priority request).  She                 
  observed  that  the  total  project  will cost  $30  million                 
  dollars over five years.  Half  of this will come from state                 
  general funds.  The Department  estimates that there will be                 
  a net savings  in non-payment of  benefits.  She  emphasized                 
                                                                               
                                3                                              
                                                                               
                                                                               
  that the complications  of the current  system have made  it                 
  "almost unworkable".    The Department  estimates  that  the                 
  system,  once completed, will  serve for  15 years  or more.                 
  She  clarified  that  the  current  eligibility  information                 
  system will remain on the Anchorage mainframe.                               
                                                                               
  Representative Brown observed that 10 positions are included                 
  in  the  request.   She  asked  if the  redesign  will allow                 
  welfare and public assistance programs to share information.                 
                                                                               
  MARGO  NASH, DIVISION  OF  PUBLIC ASSISTANCE,  DEPARTMENT OF                 
  HEALTH  AND SOCIAL  SERVICES stressed  that the  feasibility                 
  study looked at  the involvement of ancillary  divisions and                 
  agencies that interface within the Department.                               
                                                                               
  Ms. Clarke reviewed  the Department's CIP request  of $412.5                 
  thousand   dollars for  Harborview Data  and Communications,                 
  Developmentally  Disabled  Section   Information  Management                 
  System  and the API Information  System (This is a component                 
  of the Department's priority two request).                                   
                                                                               
  Ms.  Clarke  referred  to the  Department's  CIP  request of                 
  $620.4 thousand   dollars for Office Automation  and Network                 
  Expansion for  the Division  of Family  and Youth  Services.                 
  The Department has included  a Imaging Pilot System  in this                 
  request (This is  a component  of the Department's  priority                 
  two request).                                                                
                                                                               
  Ms. Clarke noted that the Department's number three priority                 
  is $500.0  thousand  dollars for  the  Public Health  Lab  -                 
  Design  and  Replacement.    Mr.  Chase explained  that  the                 
  Department received  $25 thousand  dollars in  FY  93 for  a                 
  feasibility study.   Preliminary information  indicates that                 
  replacement will be needed.                                                  
                                                                               
  Co-Chair MacLean  asked if  the Department  has looked  into                 
  alternatives to replacement.   Mr. Chase indicated  that the                 
  feasibility     study     will     address    privatization.                 
  Representative   Brown   asked    if   the   Department   of                 
  Environmental  Conservation,  Palmer Lab  could  preform the                 
  functions.    Ms.  Clarke noted  that  the  option  has been                 
  studied.  She  observed that it  was not deemed possible  to                 
  combine the functions of the Department of Health and Social                 
  Services and  the Department of  Environmental Conservation.                 
  She  added that the Department is pursing the possibility of                 
  building adjacent to the Anchorage Crime Lab.                                
                                                                               
  Representative Toohey  asked if  the Lab  could be  combined                 
  with the new Indian Health Hospital.  Mr. Chase replied that                 
  the Department  of Health and  Social Services would  not be                 
  able to locate in the same building.   He stressed that they                 
  would  be  accessible to  the Indian  Health Hospital.   Ms.                 
                                                                               
                                4                                              
                                                                               
                                                                               
  Clarke added that the feasibility  study will review whether                 
  the Department of Health and  Social Services' three current                 
  labs can be combined.                                                        
                                                                               
  Co-Chair MacLean  asked the total  project cost.   Mr. Chase                 
  noted that a  new laboratory  would cost $15  - $17  million                 
  dollars.    Representative  Martin   asked  what  additional                 
  operating  costs would be involved.   Ms. Clarke promised to                 
  supply him with the information.                                             
                                                                               
  Ms. Clarke  discussed the Department's  fourth CIP  priority                 
  request  of $8,873.7 dollars  for API Design  and Site work.                 
  Ms.  Clarke reviewed  Attachment 2.   She observed  that API                 
  2000 will replace  a failing  facility.  It  will also  down                 
  size  the facility.   She noted  that API was  not built for                 
  mental health.  There  are problems with breaking  pipes and                 
  asbestos.                                                                    
                                                                               
  (Tape Change, HFC 93-21, Side 2)                                             
                                                                               
  Ms.  Clarke  stressed  that  the  Department has  looked  at                 
  financial alternatives to reduce costs.   She concluded that                 
  it will cost  less to replace  than to repair the  facility.                 
  She referred  to page 7,  Attachment 2.  She  noted that the                 
  replacement  cost  is $251  dollars  per square  foot.   She                 
  emphasized that  the new facility  will be smaller  that the                 
  current  facility.  The current facility is licensed for 133                 
  beds the new  facility will contain  114 beds.   Twenty-four                 
  beds in the new facility  will be used by the Department  of                 
  Corrections.  Mr. Chase observed that page  9, Attachment 2,                 
  shows cost comparisons with other facilities.                                
                                                                               
  Representative Toohey observed that part of the cost will be                 
  paid by the Mental Health Trust  Account (MHTA).  Ms. Clarke                 
  clarified  that  6  percent  of  unrestricted  revenues  are                 
  deposited  into the General  Fund Mental Health  Trust.  The                 
  Mental Health  Trust  Account will  contribute $7.7  million                 
  dollars.                                                                     
  Representative Toohey asked if MHTA will pay for operations.                 
  Ms. Clarke did not know  if operations could be paid for  by                 
  MHTA.                                                                        
                                                                               
  She  assure Representative  Toohey that  the  Department has                 
  worked extensively to contain operational  costs.  She noted                 
  that MHTA dollars pay  for the current API operations.   She                 
  anticipated  that they  would continue  to pay  for  the new                 
  facility.  Mr. Chase clarified  that operation costs for the                 
  new facility will be similar to FY 92.                                       
                                                                               
  Representative Parnell asked how long  the new facility will                 
  meet Alaska's  mental health care  needs.  Mr.  Chase stated                 
  that  the  building  should  last  30   to  40  years.    He                 
                                                                               
                                5                                              
                                                                               
                                                                               
  anticipated  that  API will  be  used for  specialized care.                 
  Community  hospitals  and  community  based  programs   will                 
  provide  for  secondary care  cases.   Ms.  Clarke clarified                 
  that, based on conservative population growth estimates, API                 
  should suffice until the year 2000.                                          
                                                                               
  Representative Martin asked  where the new facility  will be                 
  built.  Ms. Clarke observed that  the new facility would fit                 
  on the current API site.                                                     
                                                                               
  Representative Navarre referred to cost comparisons on  page                 
  7, Attachment 2.  Mr. Chase clarified that the New Hampshire                 
  State Hospital has 235 beds.                                                 
                                                                               
  Ms. Clarke  discussed page 10,  Attachment 2.   She stressed                 
  that the current  situation will result  in more clients  in                 
  the hospital costing more  per client, $1 - $1.4  million in                 
  repairs and a risk of catastrophic building failure.                         
                                                                               
  Ms. Clarke noted that the  Department has submitted a letter                 
  of  intent,  through   the  certificate  of  need   program,                 
  regarding  the  number of  beds.   She  emphasized  that the                 
  Department will be conducting public hearings.                               
                                                                               
  Ms.  Clarke  commented  on  the  Department's  number   five                 
  priority, $5,776.6  million dollars for Mental  Health Trust                 
  Beneficiaries  Grants.  She pointed out that grants would be                 
  given to build  up the community based mental health system.                 
  Grants will be competitive.                                                  
                                                                               
  Ms.  Clarke  noted  that  the  Department's number  six  CIP                 
  priority request is  $1 million   dollars for  API stop  gap                 
  repairs.                                                                     
                                                                               
  Ms.  Clarke  summarized the  Department's  number  seven CIP                 
  priority request of $800.0 dollars  for the Harborview steam                 
  plant, phase II.  She noted that estimates by the Department                 
  of  Transportation  and  Public  Facilities  in FY  92  were                 
  inadequate  to  complete  the project.    This  request will                 
  complete  the  project.    She  noted  that  the  Department                 
  currently pays  $500.0  thousand  dollars  annually  to  the                 
  Department  of  Transportation   and  Public  Facilities  in                 
  heating costs.                                                               
                                                                               
  DEPARTMENT OF ADMINISTRATION                                                 
                                                                               
  NANCY BEAR-USERA, COMMISSIONER, DEPARTMENT OF ADMINISTRATION                 
  provided members  with an  outline of  the Department's  CIP                 
  requests (Attachment 3).  She emphasized that the Department                 
  has attempted to increase delivery efficiency.  She spoke in                 
  support of consolidation of leasing public facilities                        
                                                                               
                                                                               
                                6                                              
                                                                               
                                                                               
  Commissioner Usera outlined the Department's CIP requests:                   
                                                                               
       *    Computerized Hiring Forms - $250.0   to design and                 
            implement  an  integrated forms  management system                 
            for  personnel,  payroll, finance  and retirements                 
            and benefits.                                                      
                                                                               
       *    Procurement System Automation - $71 9 to implement                 
            an  automated  system  for processing  procurement                 
            actively.    This   will  maximize  larger   order                 
            purchases.                                                         
                                                                               
       *    Public Defender  Voice  Mail  System  -  $53.8  to                 
             purchase a new 42 station phone system.                           
                                                                               
       *    Pioneers'  Home  Repair  &  Renovation -  $3,001.3                 
            thousand dollars.   This request is the  result of                 
            an  audit.     Projects  will   be  brought   into                 
            compliance with ADA.                                               
                                                                               
       *    Anchorage Warehouse Services Building Improvements                 
            -$58.0 thousand dollars - program receipts will be                 
            used to  provide  a heated  storage warehouse  for                 
            surplus property.                                                  
                                                                               
       *    Anchorage Warehouse Materials  Handling Vehicle  -                 
            $65.0  thousand dollars - program receipts will be                 
            used to buy a fork lift.                                           
                                                                               
  Co-Chair  MacLean  noted  that  the  FY  93  capital  budget                 
  included $18  million dollars for data  processing projects.                 
  She asked how the Department of Administration is overseeing                 
  these projects.                                                              
                                                                               
  Commissioner  Usera  relayed  that   the  Telecommunications                 
  Information  Council  (TIC) is  progressing  in its  goal to                 
  review all  projects.   She noted  that all departments  are                 
  required to  develop plans  in compliance  with the  overall                 
  statewide plan.  She anticipates that  TIC will review FY 95                 
  data related CIP requests prior to inclusion.                                
                                                                               
  Representative Martin expressed  concern that  the State  of                 
  Alaska not develop a condition which  would create a surplus                 
  of jobs to attract out-of-state residents.                                   
                                                                               
  Representative  Brown  spoke in  support  of the  TIC review                 
  process.                                                                     
                                                                               
  Co-Chair MacLean asked  if development  of the  computerized                 
  form  could   be   accomplished   within   the   Department.                 
  Commissioner Usera replied that the Department does not have                 
  the  needed  software.    Co-Chair   MacLean  asked  if  the                 
                                                                               
                                7                                              
                                                                               
                                                                               
  Governor's  audit management  team  could  complete  a  form                 
  study.  Commissioner Usera questioned whether the Governor's                 
  audit management team would have the needed expertise.                       
                                                                               
  DEPARTMENT OF LABOR                                                          
                                                                               
  JOHN ABSHIRE, DEPUTY  COMMISSION, DEPARTMENT OF LABOR  noted                 
  that  the  Department's  total  CIP  request is  $1  million                 
  dollars.  He reviewed the Department's CIP requests:                         
                                                                               
       *    Labor Standards  &  Safety  Program  Automation  -                 
            $186.0  thousand dollars  to establish  a computer                 
            network;                                                           
                                                                               
       *    Workers' Compensation Records Automation  - $495.7                 
            thousand dollars for an imagining project;                         
                                                                               
  Representative Brown asked  the status of the  Imaging Study                 
  to be completed by the Department of Administration.                         
                                                                               
  DAVID TEAL,  DIRECTOR, DIVISION OF  ADMINISTRATIVE SERVICES,                 
  DEPARTMENT OF LABOR stated  that a RFP has been  prepared by                 
  the  Division   of  Information   Services,  Department   of                 
  Administration.    He noted  that  the  RFP will  ask  for a                 
  consultant to develop a statewide view  in regards to future                 
  technology  and to  exam  the needs  of  departments for  an                 
  imaging system.   He assured  Representative Brown that  the                 
  Department  will  follow   the  guidelines  which  will   be                 
  developed.                                                                   
                                                                               
  Mr.  Abshire  continued  to  outline  the  Department's  CIP                 
  requests:                                                                    
                                                                               
       *    Mechanical Inspection Equipment Purchase  - $78.60                 
            thousand dollars for a photo  licencing system and                 
            other equipment;                                                   
                                                                               
       *    Occupational  Safety &  Health  Equipment -  $67.6                 
            thousand   dollars   for   office,  training   and                 
            personnel   protection   and   electronic  testing                 
            equipment;                                                         
                                                                               
       *    Economic  and  Demographic  Information  Equipment                 
            Upgrade  - $172.0  thousand  dollars for  computer                 
            upgrades.                                                          
                                                                               
  PAUL ARNOLDT, DIRECTOR, WORKERS' COMPENSATION, DEPARTMENT OF                 
  LABOR clarified that the Workers' Compensation Fund can only                 
  be used to fund grants.                                                      
                                                                               
  Co-Chair MacLean asked for information  concerning the FY 93                 
  $1.7 million dollar appropriation.   Mr. Teal clarified that                 
                                                                               
                                8                                              
                                                                               
                                                                               
  the funds were  spent in the Division of Employment Security                 
  for an integrated data base.                                                 
                                                                               
  Representative   Martin  asked   if   user  fees   could  be                 
  instigated.   Mr. Abshire  observed that  the Department  is                 
  researching a claims fee or a surcharge.                                     
                                                                               
  (Tape Change, HFC 93-21, Side 1)                                             
                                                                               
  Co-Chair  MacLean  informed  the Department  of  Labor  that                 
  requests for  furniture replacements will  be scrutinized by                 
  the House Finance Committee.                                                 
                                                                               
  DEPARTMENT OF MILITARY AND VETERANS AFFAIRS                                  
                                                                               
  JEFF MORRISON, DIRECTOR, DIVISION OF ADMINISTRATIVE AFFAIRS,                 
  DEPARTMENT OF MILITARY  AND VETERANS AFFAIRS noted  that the                 
  Department has four  CIP requests.  Mr. Morrison  noted that                 
  HB  60  contains  authorization for  $3  million  dollars in                 
  federal funds  for environmental  compliance  projects.   He                 
  explained  that  this  is authority  to  receive  and expand                 
  federal funds.   The  funding will  be used  to restore  and                 
  replace land around storage tanks on armory land.                            
                                                                               
  Mr.  Morrison  noted that  the Department  is asking  for $2                 
  million  general fund dollars and $3.1  in federal funds for                 
  deferred maintenance of  Armory Guard facilities.   He noted                 
  that there is  a $6 million  general fund dollar backlog  in                 
  deferred  maintenance.    He  emphasized  that this  is  the                 
  Department's number one priority.                                            
                                                                               
  Mr. Morrison  discussed the Department's  request for $100.0                 
  thousand general  fund dollars  and $100.0  thousand federal                 
  dollars  for  maintenance  of  the  Fairbanks  Armory.    He                 
  explained that the Legislature appropriated $450.0  thousand                 
  dollars for design  of this  project in 1991.   The  request                 
  would  complete  the  design,  begun  by the  Department  of                 
  Transportation and  Public Facilities, and make  the project                 
  eligible  for federal  construction  funding.   Construction                 
  funding will be a 75/25,  federal/state match.  Construction                 
  will cost $1.3 million general fund and $3.9 million federal                 
  dollars.                                                                     
                                                                               
  Mr. Morrison noted that the Department's second CIP priority                 
  is  $1.5  million  dollars for  Emergency  Operation  Center                 
  Enhancements.    He noted  that  the following  projects are                 
  included in this request:                                                    
                                                                               
       *    Relocation of the Alaska State Troopers Detachment                 
            B Communications and Dispatch Center to the SEOC;                  
                                                                               
       *    SEOC Furnishing and Equipment;                                     
                                                                               
                                9                                              
                                                                               
                                                                               
       *    Emergency Power Generator;                                         
                                                                               
       *    Armory Modem Pool                                                  
                                                                               
  Mr. Morrison clarified that state general funds are required                 
  for all federal matching grants.                                             
                                                                               
  Co-Chair MacLean noted  that there  is $8.8 million  dollars                 
  for  Armory Guard maintenance in  the operating budget.  Mr.                 
  Morrison clarified  that the operating  budget includes both                 
  federal  and state funds.   He  emphasized that  this amount                 
  covers utilities, operations  and preventative  maintenance.                 
  He noted  that the  Department is  not keeping  up with  the                 
  deferred maintenance schedule.                                               
                                                                               
  Mr. Morrison noted that the  federal government will provide                 
  75  percent of the construction cost of the Fairbanks Armory                 
  and  100  percent   of  the   cost  of  the   organizational                 
  maintenance  shop.  The bulk of the design cost must be paid                 
  for  by  the State  of Alaska  in  order to  receive federal                 
  funding.                                                                     
                                                                               
  Co-Chair  MacLean  noted  that   $1.3  million  dollars  was                 
  appropriated in  FY 92  for four  armory expansion  designs.                 
  She noted that the Fairbanks Armory  was listed as 22,840 sq                 
  ft.  The Fairbanks Armory is  currently planned at 28,500 sq                 
  ft.   Mr.  Morrison clarified  that the  increase  in square                 
  footage corresponds to federal  requirements based on  units                 
  assigned to the facility.                                                    
                                                                               
  Co-Chair MacLean asked why funding for the relocation of the                 
  Alaska State Troopers  is included in the  Department's SEOC                 
  request.                                                                     
                                                                               
  HUGH L. COX,  III, COMMISSIONER, DEPARTMENT OF  MILITARY AND                 
  VETERANS AFFAIRS responded via teleconference that the State                 
  of Alaska is  responsible for equipping the  State Emergency                 
  Center.    The Center  was moved  in  1991.   Commission Cox                 
  discussed  the  State  Emergency  Center.     He  noted  the                 
  importance of working with the State Troopers during a state                 
  emergency.    He  emphasized  that  the  State  of  Alaska's                 
  emergency response capability needs to be improved.                          
                                                                               
  ADJOURNMENT                                                                  
                                                                               
  The meeting adjourned at 2:26 p.m.                                           
                                                                               
                                                                               